高级检索

    土地整理项目土方量计算方法

    Method to Calculate Earthwork in Land Consolidation Project

    • 摘要: 应用二重积分的基本原理,研究以数字高程模型(DEM)不同分辨率确定土方量的方法。以河北省南宫市清凉江项目为例进行了计算分析,并与相关文献计算结果进行了对比,说明用该方法计算土方量是可行的。

       

      Abstract: The paper discusses how to calculate earthwork of land consolidation project using different resolutions of Digital Elevation Model (DEM), and takes Qingliangjiang project in Nangong city of Hebei Province as a case to analyze the results and compare them to other literature. The results show that the method raised is feasible.

       

    /

    返回文章
    返回